Quick answer
Florida fair rental value review starts with the agency’s existing facility data and a project-level bridge to the asset record. Separate completed qualifying projects from work in progress and routine purchases, verify beds and allocated square footage, and choose the correct approval, update or correction submission route before the applicable cutoff.
The asset ledger and the Florida fair rental value survey answer different questions. The ledger records capital accounting. The survey supplies specific inputs to a prospective payment calculation. A large construction balance can be real while remaining outside the current survey's completed-project population.
For a controller preparing an FRV submission, the useful deliverable is a bridge from the agency's existing data to proposed changes, with evidence for every changed input. It should also identify which items must wait or require clarification.
Begin with the agency's data and the current cycle
The AHCA FRV survey page directs facilities to download existing data, review it and choose one submission type. It identifies April 30, 2026 for October 2026 rate setting and a July 7, 2026 compiled dataset for October 2027. Do not treat those two labels as the same submission cycle.
Section IV.A of the posted long-term care reimbursement plan uses calendar-year project reporting and completion-year treatment for multi-year projects. Its April 30 cutoff moves to the next business day for a weekend; it does not provide extensions. The current link label and internal PDF version differ, so retain the actual file and confirm the applicable incorporated version for a disputed filing.
As of this guide's November 2026 review, the April 2026 deadline has passed. A preparation workflow for the next cycle should use the then-current instructions and agency dataset, not relabel an old filing as timely.
Build a project bridge, not a capital-spending total
Assume a fictional 100-bed facility is preparing its calendar 2026 project review. These figures are original examples and do not reproduce valuation tables.
| Project | Ledger evidence | Completion evidence | Proposed survey treatment |
|---|---|---|---|
| Defined building improvement | $60,000 attributable to licensed NF space | Completed December 2026 | Review as a separate completed renovation project; $600 per licensed bed exceeds the cited threshold |
| Multi-year expansion | $150,000 spent during 2026 | Completion scheduled for January 2027 | Keep as work in progress for this project-year review; confirm final completion before a later submission |
| Unrelated replacements | $40,000 of routine capital purchases | Individual purchase dates | Do not bundle into one renovation to create eligibility |
The ledger's $250,000 total does not become $250,000 of reportable completed renovations. The first project contributes a proposed $60,000 input subject to supporting evidence and state review. The second has a timing issue; the third has a project-definition issue. Neither is resolved by adding more invoices to a total.
The plan bars bundling unrelated assets and requires separate projects. Its detailed instructions and the current survey page describe a $500-per-bed threshold, while one plan definition uses “exceeds.” A project exactly on that boundary deserves written clarification. The $600-per-bed example avoids deciding that inconsistency for a real facility.
Reconcile beds and square footage independently
Assume the agency record lists 100 licensed beds and 50,000 square feet. The facility's current measured gross area is 56,000 square feet, but 6,000 serves a separate non-NF operation. A reviewer should not automatically replace 50,000 with 56,000. Assemble the license history, plans, measurements and allocation support to determine the NF input under the survey definitions.
Similarly, an operational census of 88 occupied beds does not replace the licensed-bed input. If a project adds or replaces beds, preserve the licensing event and completion evidence. A construction invoice does not establish the date when licensed capacity changed.
The survey page distinguishes gross area from area used for nursing services and requires support for shared-space allocation. For a shared kitchen, a documented reasonable allocation is more useful than attributing the whole building to whichever business paid the invoice.
Select the submission route that matches the change
If the existing agency data is correct and there are no additions, review the approval route. Option 2 addresses new projects added to a prior submission; Option 3 addresses corrections to previously submitted information and new projects. A facility with no previous submission has a separate new-submission route.
In the example, adding the $60,000 project while leaving all old inputs correct suggests an update. Discovering that the old square footage was wrong introduces a correction to prior data. Do not send competing versions through multiple routes and expect the agency to infer which is authoritative.
Create a proposed-change record with old value, new value, reason, effective or completion date, evidence, reviewer and submitted version. Preserve confirmation and any agency follow-up. Submission is not proof that AHCA accepted every project or changed the rate.
Connect the survey to the rate without inventing an uplift
After the state issues its calculation, compare the accepted beds, area, project costs and completion years with the submitted record. Investigate an omitted project as an input discrepancy before assuming an arithmetic error. The state methodology includes additional valuation inputs, so this guide does not estimate a dollar rate increase from the $60,000 project alone.
A buying evaluation can use this example to test whether finance and facility records stay linked. Require the vendor to show the excluded work in progress, the unbundled routine purchases, a square-footage correction and the submission history. Ease's skilled nursing product is planned; confirm any future capital, document or rate-reconciliation functionality. The final output should be a defensible survey packet and a clear record of what the state accepted.
Questions & answers
Should a multi-year construction project be reported each year as money is spent?
The posted reimbursement plan says to report a project in its completion year. Keep annual spending and project completion as separate fields.
Can unrelated capital purchases be combined to meet the renovation threshold?
The plan does not allow bundling unrelated assets into a renovation project. Preserve the defined project and its supporting costs.
Does a higher capital asset balance guarantee a higher FRV rate?
No. FRV uses specific facility and project inputs, applicable timing and the state methodology. The asset ledger is evidence for those inputs, not a direct rate calculator.
Primary sources
- Florida Medicaid Long-Term Care reimbursement plan linked by AHCA
- AHCA Fair Rental Value Survey current submission page
- AHCA FRV update instructions, Option 2
- AHCA FRV correction instructions, Option 3
Use the cited source and its applicable version when making a facility-specific decision. These guides explain operational evaluation methods; they are not individualized clinical, coding, or legal advice.