Compliance & Regulations

California SUD Level of Care: DHCS Designation vs ASAM

•
October 29, 2026
Clinical leadership team reviewing residential program schedules and level of care paperwork around a conference table

California residential SUD facilities need a DHCS Level of Care Designation, an ASAM Level of Care Certification, or both. Learn which route fits you.

As of October 2026. California is moving its residential rules toward the current ASAM Criteria, and DHCS guidance can change when new regulations or information notices issue. Check each citation before you file.

In California, every DHCS-licensed residential alcohol and other drug (AOD) facility holds at least one DHCS Level of Care Designation, at least one residential ASAM Level of Care Certification, or both, under DHCS guidance in BHIN 21-001. Which route you take depends on three things: the levels of care you run, whether you provide withdrawal management, and which state agency licenses your building.

This guide is for executive directors and compliance leads running residential programs with 25 or more staff, often across several sites. It covers the four DHCS designations, how they compare with ASAM certification, what provisional status means, the extra rule for Drug Medi-Cal Organized Delivery System (DMC-ODS) contracts, and what a designated facility documents in the first 72 hours. For licensing, Medi-Cal and workforce context across the state, start at the California state hub.

What Health and Safety Code 11834.015 asks of licensed facilities today

Health and Safety Code section 11834.015 directs the Department of Health Care Services (DHCS) to adopt the ASAM treatment criteria, or an equivalent evidence-based standard, as the minimum standard of care for licensed adult AOD facilities. DHCS put that standard into practice through BHIN 21-001, which it updated on August 20, 2021, and which remains the operative guidance until DHCS adopts formal regulations.

The statute has since been amended. SB 164 (2025-26 session) changed the AOD licensing chapter, and its digest says the bill would "recast detoxification as withdrawal management" (SB 164 bill text). The same digest sets January 1, 2030 as the date for DHCS regulations implementing the ASAM Criteria, lets DHCS use information notices in the meantime, and has detoxification-only licenses expire on July 1, 2027.

For operators, the practical reading is simple. BHIN 21-001 is still the rulebook for designations in October 2026, but the framework may shift as DHCS aligns its guidance with the ASAM Criteria, Fourth Edition. Build your designation file so it can be updated, not so it can sit untouched for five years.

The four DHCS designations: 3.1, 3.2, 3.3 and 3.5

DHCS offers four residential designations. BHIN 21-001 Exhibit A sets the program components, staffing and documentation rules for each.

  • Level 3.1, Clinically Managed Low-Intensity Residential Services. 24-hour structure with clinically directed activities, with at least 5 hours per week of counseling, group, education or structured therapeutic activities.
  • Level 3.2, Clinically Managed Residential Withdrawal Management. Requires DHCS approval to provide detoxification services. Trained personnel perform face-to-face physical checks at least every 30 minutes and monitor vital signs at least once every 6 hours during the first 72 hours after admission.
  • Level 3.3, Clinically Managed Population-Specific High-Intensity Residential Services. Programming for residents with cognitive or other functioning impairments, at least 5 hours per week.
  • Level 3.5, Clinically Managed High-Intensity Residential Services. Programming for residents with co-occurring mental health disorders, at least 5 hours per week, plus daily scheduled professional services.

Exhibit A adds a footnote that matters for many operators: a facility that is both DHCS licensed and certified follows the 20 hours per week minimum from the DHCS AOD Program Certification Standards, whichever route it used for its level of care. Withdrawal management staffing under Exhibit A is at least 1 awake staff member on duty for every 15 detox residents, certified in CPR and first aid and trained in naloxone, plus 6 hours of WM orientation and 8 hours of annual WM training documented in personnel records.

To apply, a facility submits the DHCS LOC Designation Application (DHCS 4022) with supporting documents. BHIN 21-001 lists them: Facility Staffing Data (DHCS 5050), a detailed monthly staff schedule, the Weekly Activities Schedule (DHCS 5086), a detailed weekly program activities schedule, and the program's level of care assessment for residents. If DHCS finds the package incomplete, the facility has 60 calendar days to send what is missing.

See this working in Ease.
Book a demo

Do California residential treatment programs need an ASAM certification or a DHCS level of care designation?

They need one or the other, and sometimes both. BHIN 21-001 says a facility that opts for ASAM certification does not also need a DHCS designation, and adds that "an approved residential ASAM LOC Certification is sufficient to meet the DHCS requirement" (BHIN 21-001). The two are not the same thing, though. DHCS states that its designations are not equivalent to or affiliated with ASAM certifications, and a DHCS designation does not guarantee ASAM eligibility.

The deciding factor is coverage. ASAM's program, delivered with CARF International, "Currently covers adult residential programs at levels 3.1, 3.5, and 3.7" (ASAM Level of Care Certification). That leaves gaps that only a DHCS designation fills:

Your program ASAM route available? What California guidance points to
Level 3.1 residential Yes DHCS designation, ASAM certification, or both
Level 3.5 residential Yes DHCS designation, ASAM certification, or both
Level 3.3 population-specific No DHCS 3.3 designation
Withdrawal management (detox) No DHCS 3.2 designation, whichever route you pick for other levels
Level 3.7 medically monitored Yes (ASAM only) ASAM certification where applicable; DHCS has no 3.7 designation

The detox row is the one that catches operators. Under BHIN 21-001, initial applicants and licensed facilities that are approved or pending approval for detoxification services apply for DHCS Level 3.2 and file a DHCS 4022, even when they hold or seek ASAM certification for their other levels (BHIN 21-001). The notice explains why: ASAM was not offering a 3.2 withdrawal management certification.

How should a multi-site operator choose? A few practical questions settle most cases:

  1. Which levels does each site run? Under BHIN 21-001, a site with 3.3 or withdrawal management needs at least one DHCS designation, whatever route it uses for its other levels.
  2. Do payers or county plans in your market ask for ASAM certification by name? If so, ASAM certification for 3.1 and 3.5 may earn its cost.
  3. Can you sustain two review cycles? ASAM certification runs on a three-year term with annual attestation and a recertification survey, according to ASAM's program page, while DHCS designations sit inside DHCS licensing compliance reviews.
  4. What happens if a certification lapses? Under BHIN 21-001, a facility whose ASAM certification is suspended or revoked stops providing that level until the certification is reinstated or it obtains a DHCS designation. Holding both gives a fallback.

For a refresher on how the levels themselves differ clinically, see our guide to ASAM levels of care.

Want to see it with your own workflows?
Book a demo

Why provisional status matters and what the compliance review checks

A new DHCS designation is not final on approval. DHCS says designations "remain provisional until DHCS has completed an on-site or virtual compliance review" (DHCS Level of Care Designation). Once DHCS verifies the facility, it revises the license to remove the provisional status.

BHIN 21-001 describes what that review looks like. DHCS may interview clients and staff in private and inspect program records, and may hold an exit interview with the program director. DHCS sends a written license report listing deficiencies within 10 working days of the review, and the facility sends written verification of corrections within 30 calendar days unless DHCS sets a shorter deadline for a health and safety issue.

Two other BHIN 21-001 deadlines belong on a compliance calendar:

  • Ten working days to notify DHCS in writing if the facility stops providing any designated level.
  • Ten working days to send DHCS a copy of any ASAM certification approval, denial, citation, corrective action plan, suspension or revocation.

BHIN 21-001 also limits services to the scope of the license and the designation or certification. Under BHIN 21-001, a facility adding a new designated level files a DHCS 4022 and does not provide the new level until DHCS approves it. For an operator opening a new unit or converting beds, that approval belongs on the project plan before the first admission. Our bed management and census guide covers the operational side of tracking which beds serve which level.

Questions about your setup? Ask them on a demo.
Book a demo

The extra rule for DMC-ODS: facilities licensed by other agencies need ASAM certification

Operators that contract with a county DMC-ODS plan face a second layer. BHIN 24-001 says residential facilities licensed by a state agency other than DHCS "must have an ASAM LOC Certification for each level of care" they provide under DMC-ODS (BHIN 24-001). That covers, for example, residential facilities licensed by the Department of Social Services, which also need DMC certification to offer Levels 3.1, 3.3 or 3.5 in the program.

The reason is structural. DHCS designations are available only to DHCS-licensed facilities, so a DSS-licensed site has no DHCS route. For DHCS-licensed facilities, BHIN 24-001 accepts a DHCS designation, an ASAM certification, or both.

BHIN 24-001 also makes DMC-ODS plans responsible for verifying that providers delivering Levels 3.1, 3.3 or 3.5 hold the right designation or certification for each level, effective January 1, 2024. In practice, expect your county plan to ask for the current license showing designations, or the ASAM certificate, at credentialing and at contract renewal. If you bill Medi-Cal for other services too, our California Medi-Cal billing guide covers the specialty mental health side.

What the 72-hour multidimensional assessment has to show for a designated facility

The designation is earned on paper and kept in the chart. BHIN 21-001 Exhibit A states that "A multidimensional assessment must be conducted and completed within 72 hours following resident admission" (BHIN 21-001 Exhibit A). The assessment should integrate the six ASAM dimensions: intoxication and withdrawal potential, biomedical conditions, emotional and behavioral conditions, readiness to change, relapse potential, and recovery environment.

Who completes it matters. Under Exhibit A, an LPHA conducts the assessment, or a certified or registered AOD counselor may complete it when an LPHA reviews and approves it and makes the final determination of care. If counselors draft assessments for LPHA sign-off, our guide to clinical supervisor review queues covers how to define who can act on that review and what evidence shows it was completed. A resident admitted for detoxification can instead complete a pre-assessment within 72 hours, as long as there is a contingency plan to transfer the resident to a level where a full assessment happens.

Exhibit A sets the documentation clock that follows:

  • Treatment or recovery plan within 10 calendar days of admission, developed or reviewed only by clinical and professional staff.
  • Progress review within 30 calendar days of signing the plan, then at least every 30 calendar days.
  • Service documentation within 72 hours of each assessment, case management contact, individual or group counseling session, education session or plan development, recording the type of service, start and end times, topic and the name and title of the staff member.
  • Detox exemption. Residents in the detoxification phase are exempt from the plan and service documentation rules during that phase, but the 30-minute checks and vital signs are recorded and signed in the resident's file.

These are the records a DHCS compliance reviewer opens. A file that shows the 72-hour assessment, the LPHA sign-off, the 10-day plan and the 30-day reviews is what turns a provisional designation into a final one. For plan structure, see our treatment planning best practices.

See this working in Ease.
Book a demo

How Ease fits a level-of-care-driven residential program

Ease tracks level of care as a placement on each patient's chart, with admission, continued-stay, transfer and discharge statuses, and each organization picks which levels from the Ease catalog apply to its programs. For multi-site groups, admins configure which sites offer each level of care so clinicians see the relevant options. Treatment planning lives inside the same chart, with customizable clinical forms, and a per-location bed board shows bed assignments with projected availability driven by each resident's estimated discharge date. None of this stands in for a DHCS designation or an ASAM survey. It keeps the assessment forms, treatment plan and level-of-care history a reviewer asks for in one record. See how this works for residential treatment programs.

Key takeaways for California operators

  • Every DHCS-licensed residential AOD facility holds a DHCS designation, a residential ASAM certification, or both, under BHIN 21-001.
  • ASAM certification can stand in for a DHCS designation at 3.1 and 3.5, and covers 3.7, but there is no ASAM route for 3.3 or 3.2.
  • Detox programs apply for DHCS 3.2 under BHIN 21-001 whatever route they choose for other levels. See our detox glossary entry for terminology.
  • DHCS designations stay provisional until the compliance review clears.
  • For DMC-ODS, facilities licensed by agencies other than DHCS need ASAM certification per level, and county plans verify it.
  • SB 164 recasts detox as withdrawal management and points DHCS toward ASAM-based regulations by 2030, so revisit your designation file whenever DHCS issues new guidance.
Want to see it with your own workflows?
Book a demo

Frequently Asked Questions

Can a California residential facility hold both a DHCS designation and an ASAM certification?

Yes. DHCS guidance in BHIN 21-001 says nothing precludes a licensed AOD facility from holding both a DHCS Level of Care Designation and an ASAM Level of Care Certification. Some operators hold an ASAM certification for 3.1 or 3.5 and a DHCS designation for 3.2 withdrawal management.

Does an ASAM certification cover withdrawal management in California?

No. ASAM's certification program covers adult residential levels 3.1, 3.5 and 3.7. Under BHIN 21-001, a California facility approved or pending approval for detoxification services applies for DHCS Level 3.2 Clinically Managed Residential Withdrawal Management even if it chooses ASAM certification for its other levels.

What does provisional status on a DHCS designation mean?

DHCS issues a provisional designation once the application is complete. It stays provisional until DHCS finishes an on-site or virtual compliance review, after which DHCS issues a revised license without the provisional status.

Do facilities licensed by the Department of Social Services need an ASAM certification for DMC-ODS?

Under BHIN 24-001, residential facilities licensed by a state agency other than DHCS that deliver DMC-ODS residential services at Levels 3.1, 3.3 or 3.5 need an ASAM Level of Care Certification for each level they provide. DHCS designations are available only to DHCS-licensed facilities.

Who can complete the 72-hour assessment in a DHCS-designated facility?

BHIN 21-001 Exhibit A allows a Licensed Practitioner of the Healing Arts (LPHA) to complete it, or a certified or registered AOD counselor when an LPHA reviews and approves the assessment and makes the final determination of care.

Want to see how Ease handles this?